Year 2 - Hot stick, extendo stick and elbow puller
Year 2 - Load break elbow installation
Year 2 - Pot head installation
Year 2 - Climbing refresher
Year 2 - Damaged and broken conductor repair
Year 2 - URD splicing (primary)
Year 2 - URD splicing (secondary)
Year 2 - Elbow installation
Year 2 - URD transformer installation
Year 2 - OH transformer installation
Year 2 - Secondary service installation
Year 2 - Dead end primary installation
Year 2 - CPR/ First Aid
Year 2 - Pole top rescue
Year 2 - Bucket rescue
Year 2 - T-brackets, arresters and pothead installation
Year 2 - O/H Line II
Year 2 - U/G Line I
Year 2 - Computer base training
Year 3 - Transformer bank installation
Year 3 - Voltage regulator installation and operation
Year 3 - Crossarms installation
Year 3 - Primary fault locator
Year 3 - URD transformer installation
Year 3 - O/H transformer installation
Year 3 - Climbing refresher
Year 3 - Capacitors installation
Year 3 - Electronic recloser installation
Year 3 - Pole top rescue
Year 3 - Bucket rescue
Year 3 - CPR/First Aid
Year 3 - O/H Line III
Year 3 - Computer base training
Year 4 - Wire sag
Year 4 - Transformer bank installation
Year 4 - Recloser by-pass and installation (manual and electronic)
Year 4 - Climbing refresher
Year 4 - Recording amp meter installation
Year 4 - Recording volt meter installation
Year 4 - Regulator by-pass
Year 4 - Taking substation out of service
Year 4 - CPR/First Aid
Year 4 - Pole top rescue
Year 4 - Bucket rescue
Year 4 - O/H Line IV
Year 4 - U/G Line II
Year 4 - Computer base training
Year 5 - Three phase transformer connections and different 3 phase voltages
Year 5 - Wire sag
Year 5 - Transformer bank installation
Year 5 - Recloser by-pass and installation (manual and electronic)
Year 5 - Climbing refresher
Year 5 - Recording amp meter installation
Year 5 - Recording volt meter installation
Year 5 - Regulator by-pass
Year 5 - Taking a substation out of service
Year 5 - CPR/First Aid
Year 5 - Pole top rescue
Year 5 - Bucket rescue
Year 5 - Advance Line
Year 5 - Computer base training
On-the-job training
Electrical Distribution line work processes for OH and UG construction: Personal Protection Equipment (PPE), safety, first aid/CPR, the use and care of trade tools/equipment.
Non-energized construction/maintenance involving: setting poles, climbing, installation of OH/UG conductors, crossarms, insulators, down guys, OH/UG transformers, elbows, switch gears
Secondary (low voltage) energized lines involving: setting poles, installation of services wires, setting meters, use of blocks, trouble shooting and making repairs.