Lineman

Hybrid-based
ONET: 49-2051.00

4

Years

76

Skills

580h

Related instructions

7980h

On-the-job training
Classroom instruction topics
  • Basic Electricity
  • Generation & Transmission of Electricity
  • Basic Math & Algebra
  • Nomenclature, Use of Tools and Equipment, Equipment Maintenance
  • Ropes, Knots & Splices
  • Conductors, Current Carrying Capacity
  • Construction & Maintenance of Distribution & Transmission Lines
  • Underground Systems
  • Series & Parallel Circuits
  • Inductance, Reactance, Alternating Current
  • Three Phase Systems
  • Transformer Connections (Wye & Delta)
  • Voltage Regulators; Capacitors
  • Substation Erection & Maintenance
  • Metering
  • Work Procedures - Transformers, Regulators, Reclosurers and Sectionalizers, OCB's
  • Use of Voltmeters, Ampmeters
  • Protective Grounding
  • Troubleshooting
  • First Aid, CPR, Pole Top Rescue
  • Safety
  • Mapping and Locating and Traffic Control
On-the-job training
  • Pole Climbing
  • Poles/Framing Fixtures
  • Stringing and Sagging Conductors
  • Transformers
  • Services/Street Lighting
  • Underground Cable and Associated Equipment
  • Protective Equipment - Personal
  • Maintenance and Transformers
  • Substation Maintenance
  • Company Training
  • Competencies
    • Apply basic electricity and Ohms law
    • Wye and Delta configuration
    • Wire gauge and amperage
    • Series and parallel circuits
    • Generators and motors theory
    • Installing pole grounds and equipment grounds
    • Pole Framing on the ground
    • System troubleshooting
    • Theory of single, double and 3 phase
    • Basic Climbing Skills
    • Care & Inspection of Climbing Gear
    • Pole Inspection
    • Sharpening & Shaping of Climber Gaffs
    • Installation of guy assemblies
    • Safe working procedures installing cross arms
    • Proper use of perform tie wire
    • Demonstrate proper use of hot-line tools on energized lines
    • Demonstrate grounding techniques on trucks when using them in energized line situations
    • Pole Top Rescue
    • Aerial Pole Framing
    • Proper emergency procedures and bucket/basket rescue
    • Demonstrate safe pole setting practices
    • Demonstrate temporary pole supports
    • Perform grounding and safe work procedures
    • Perform a service wire installation
    • Perform temporary service installation
    • Perform building new construction
    • Perform dead ending and splicing
    • Safely string conductors in hot line re-conductoring
    • Perform use of proper tie wire for aluminum and copper conductor\
    • Make up jumpers on dead-end poles correctly
    • Operate reclosures and sectionalizes and properly install them on URD and overhead systems
    • Demonstrate proper use of cover-up material on energized lines
    • Demonstrate proper set-up of vehicle when preparing to work on energized electric lines
    • Demonstrate all safety aspects on installing and removing switches on a hot-line task
    • Demonstrate how to properly fuse switches so that the coordination of all equipment will work correctly
    • Demonstrate the proper use of lightning protection
    • Perform safe work practices in a substation
    • Demonstrate proper procedure of a substation inspection
    • Switching procedures
    • Over current devices
    • Voltage regulators
    • Internship
    • Safe Work Procedures & Responsibilities
    • Perform proper vehicle inspection and maintenance
    • Demonstrate inspection of mobile hydraulic system
    • Perform traffic control in a work area safely
    • Demonstrate operation of digger derrick vehicle
    • Demonstrate rigging and shoring a trench
    • Safe working operation of an aerial platform
    • Work site recognition and safe work practices
    • Perform proper vehicle placement and grounding methods
    • Apply cover-up materials in a safe manner
    • Perform proper rigging and setting of poles
    • Practice safe work practices and hazard recognition
    • Successfully read sag charts and tables
    • Use proper hoist and grips for conductor
    • Inspect rubber goods and hard-shell cover-ups
    • Demonstrate installation of a voltage regulator
    • Demonstrate substation grounding
    • Perform proper operation of a trencher
    • Perform safe trenching and excavating procedures
    • Perform safe work practices and protective grounding
    • Demonstrate troubleshooting and fault locating on an URD system
    • Demonstrate how to use and maintain equipment that is being used
    • Fusing applications for single phase and 3 phase applications
    • Proper grounding application for single phase and 3 phase applications
    • Proper sizing of transformer on single phase and 3 phase applications
    • Internal working parts of a pole mount and pad mount transformers
    • Demonstrate single phase transformer connections
    • Demonstrate 3 phase transformer connections
    • Demonstrate proper equipment grounding
    • Proper transformer protection and sizing applications
    • Proper placement of transformers on pole and underground
    • Teamwork
    • Insulation installation
Interested in this apprenticeship?
Sign up to receive notifications about changes and updates about Lineman.
Headquarters location
Augusta, KS (67010)
State
calendar.svg
Get on our calendar
Not sure if WorkHands is right for you? Chat with our team today
sendEmail.svg
Send us an email
We'll get back to you shortly